Select Page

Provision crane Hydraulic Piston Rod reconditioning with Laser Cladding

by | Mar 10, 2022 | CASE STUDY

Because of its many advantages, laser cladding slowly replaces conventional hard chrome plating on Hydraulic Pistons reconditioning.

Provision crane Hydraulic Piston Rod reconditioning with Laser Cladding

The repair of cast iron, steel, or aluminum pistons is an advanced, cost-effective solution

Because of its many advantages, laser cladding slowly replaces conventional hard chrome plating on Hydraulic Pistons reconditioning.

Evolution in laser cladding technology enables us to recondition thinner and longer parts, such as Provision Crane Piston Rods. Due to meager heat input and distortion, the reconditioning of small diameter and thin-walled parts is possible while simultaneously reducing the need for post-weld heat treatment.

The above applies especially in the most demanding applications like marine, offshore, oil & gas, and, mining, especially once one considers that it allows for hardness up to 55 – 58 HRC.

Laser Cladding assets compared to Chrome Plating 
  • Full metallurgical bond
  • Thicker layer compared to hard chrome plating
  • Material, not prone to microcracking or peeling off
  • High impact resistance
  • Excellent anti-corrosion properties that maintain the surface shiny, without corrosion, even after a 5000 hours salt spray test
  • Environmentally friendly process

Our state-of-the-art machinery enables us to clad and grind to perfect surface finish rods more than 5 meters in length. At our mechanical workshop, by using laser cladding technology, we apply special powders as chrome replacements.

 

The above applies especially in the most demanding applications like marine, offshore, oil & gas, and, mining, especially once one considers that it allows for hardness up to 55 – 58 HRC.

Read more

Learn the latest Injegov News, including information on our company’s latest investments, innovations and corporate social responsibility acts.

Oct 01 2024

Damper Inspection for 2-Stroke Engine

In this case study, we detail the damper inspection process on a 2-stroke, 5-cylinder MAN engine from a bulk carrier....
Sep 30 2024

JENBACHER J420 Minor Overhaul

Ensuring Peak Engine Performance with INJEGOV SA. Discover how INJEGOV SA improved engine efficiency through a...
Sep 22 2024

GEISLINGER Marine Technical Workshop

GEISLINGER and INJEGOV SA Successfully Conclude Technical Workshop on ICE Vibration Management with Expert...
Jul 12 2024

Jenbacher 420 misfire troubleshooting

Explore our case study on solving misfire issues in the Jenbacher 420 biogas engine, emphasizing preventive...
Jul 08 2024

Biogas Engine Maintenance and Siloxane Challenges

This case study explores the premature failure of precombustion chambers in biogas engines and offers insights into...
Jul 04 2024

INJEGOV Attends PowerUP’s “Shaping The Future” Sales Conference

INJEGOV SA, the go-to distributor of PowerUP spare parts in Greece, proudly took part in the exciting “Shaping...
Jun 21 2024

POSIDONIA 2024 highlights

INJEGOV’s participation, achievements, and experience summary during the Posidonia 2024 week.
Apr 23 2024

A Cyprus Technical High School’s Visit to INJEGOV Mechanical Workshop

A group of technical high school students from Cyprus visited our mechanical workshop in Piraeus. The visit was...
Apr 22 2024

BOSCH visit at INJEGOV mechanical workshop in Greece

It is with great pleasure that we announce the visit of our BOSCH partners to renew our contract agreement as a BOSCH...
Apr 05 2024

ISO Certification renewal for our workshop in Tuzla

We are pleased to announce that our workshop in Tuzla, Turkey, has earned a three-year ISO certificate for conformance...
My Inquiry
Your inquiry is empty.

Have not found what you looking for? Contact us at technical@injegov.gr.