Select Page

Provision crane Hydraulic Piston Rod reconditioning with Laser Cladding

by | Mar 10, 2022 | CASE STUDY

Because of its many advantages, laser cladding slowly replaces conventional hard chrome plating on Hydraulic Pistons reconditioning.

Provision crane Hydraulic Piston Rod reconditioning with Laser Cladding

The repair of cast iron, steel, or aluminum pistons is an advanced, cost-effective solution

Because of its many advantages, laser cladding slowly replaces conventional hard chrome plating on Hydraulic Pistons reconditioning.

Evolution in laser cladding technology enables us to recondition thinner and longer parts, such as Provision Crane Piston Rods. Due to meager heat input and distortion, the reconditioning of small diameter and thin-walled parts is possible while simultaneously reducing the need for post-weld heat treatment.

The above applies especially in the most demanding applications like marine, offshore, oil & gas, and, mining, especially once one considers that it allows for hardness up to 55 – 58 HRC.

Laser Cladding assets compared to Chrome Plating 
  • Full metallurgical bond
  • Thicker layer compared to hard chrome plating
  • Material, not prone to microcracking or peeling off
  • High impact resistance
  • Excellent anti-corrosion properties that maintain the surface shiny, without corrosion, even after a 5000 hours salt spray test
  • Environmentally friendly process

Our state-of-the-art machinery enables us to clad and grind to perfect surface finish rods more than 5 meters in length. At our mechanical workshop, by using laser cladding technology, we apply special powders as chrome replacements.

 

The above applies especially in the most demanding applications like marine, offshore, oil & gas, and, mining, especially once one considers that it allows for hardness up to 55 – 58 HRC.

Read more

Learn the latest Injegov News, including information on our company’s latest investments, innovations and corporate social responsibility acts.

Dec 12 2025

Pielstick Engine Major Overhaul

A 12,000 running hours major overhaul was carried out by INJEGOV on a Pielstick medium-speed diesel engine operating...
Dec 11 2025

Understanding FIVA Valves & Their Impact on ME Engine Performance

FIVA valves play a critical role in fuel injection and exhaust timing on ME engines. This insight explains how they...
Nov 27 2025

Workshop Upgrades with FIVA Test Bench and Specialized Training

INJEGOV has upgraded its workshop with a state-of-the-art test bench for FIVA, ELFI, and ELVA valves, enabling highly...
Nov 27 2025

Four-Stroke Crankshaft Reconditioning with Laser Cladding

This project showcases the complete reconditioning of a four-stroke crankshaft at INJEGOV’s mechanical workshop in...
Nov 17 2025

Woodward UG-10 Governor

A high-output mechanical-hydraulic governor delivering precise, stable speed control for diesel/gas engines and steam...
INJEGOV Renews GALI Authorized Distributor Agreement for 2026
Nov 13 2025

INJEGOV Renews GALI Partnership for 2026

INJEGOV welcomed GALI’s Branch Director, Enrico Borando, to its headquarters in Greece for the official signing of the...
Nov 03 2025

INJEGOV Appointed GEISLINGER Authorized Distributor for Cyprus and Israel

After two years of successful collaboration in Greece as an official Sales and Service Partner, INJEGOV S.A. has been...
Nov 01 2025

Complete Overhauling of MAN B&W 6S60MC-C Main Engine and Auxiliary Systems

Complete overhauling of a MAN B&W 6S60MC-C main engine, including full mechanical inspection, pump and motor...
Gali A27 Air Starter for 220–1,100 kW engines
Oct 31 2025

GALI A27 Air Starter

The GALI A27 Air Starter delivers reliable starting power for engines in generator sets, motor pumps, and auxiliary...
Upgrade to Geislinger GMS Mk6 for advanced AI-powered multi-engine monitoring, enhanced diagnostics, and vessel efficiency
Oct 31 2025

Multi-Engine Monitoring with Geislinger Digital Solutions

Upgrade to the Geislinger GMS Mk6 and elevate your vessel’s engine monitoring with AI-powered diagnostics,...