CCGT Powerplant Maintenance case study

by | Sep 27, 2021 | CASE STUDY

Greece's most prominent private independent electricity producer approached us in early 2020, a couple of months ahead of their major shutdown...

Powerplant maintenance

Greece’s most prominent private independent electricity producer approached us in early 2020, a couple of months ahead of their major shutdown. Their request was to support them with the maintenance of steam valves and the balance of plant equipment such as pumps and heat exchangers.

The facility concerned a CCGT (Combined Cycle Gas Turbine) plant with 600MW output and is one of the most modern and efficient natural gas-fired power plants in the Balkans. After a few site visits and an extensive tendering procedure, the plant managers awarded us the contract. For about five months, we supported our partner daily on-site and in our workshop.

Scope of work

Scope of work involved the overhaul along with reconditioning and testing of:

  • Plate Heat Exchangers
  • Gearboxes
  • Pumps
  • Pneumatic actuators
  • Gate valves
  • Globe valves
  • Control valves
  • Ball valves
  • Safety valves
  • Butterfly valves

Note that we reconditioned valves of sizes of 0,5 up to 20 inches and working pressures of up to 180 bar. Except for the reconditioning of bolt bonnet valves, we repaired pressure seal bonnet valves online with 100% success avoiding the costly and time-consuming removal and welding procedures.

Project in numbers

heron numbers

To sum up, we provided a-z support to our customers from the project’s kick-off until the final day of recommissioning of the power plant, even providing support to the gas turbine makers’ on-site staff.

The feedback received from the customer’s technical staff and top management was excellent, and we were immediately awarded additional contracts for future works in the power plant.

Read more

Learn the latest Injegov News, including information on our company’s latest investments, innovations and corporate social responsibility acts.

Dec 29 2025

Shanghai Mechanical Workshop

INJEGOV SA announces the opening of its new Mechanical Workshop in Shanghai, expanding technical services and spare...
2025 retrospect
Dec 16 2025

2025 Retrospect

A look back at 2025: strategic expansions, technical excellence, and strong partnerships that drove INJEGOV’s growth...
Dec 16 2025

On-Site Crankshaft Grinding: Reduce Downtime & Costs

On-site crankshaft grinding restores damaged journals to OEM tolerances without crankshaft removal, reducing downtime,...
Dec 16 2025

INJEGOV SA Receives ESG Rating Certificate

INJEGOV SA has received an ESG Rating B through the Synesgy platform by ICAP CRIF, confirming a moderate–high level of...
Dec 12 2025

Pielstick Engine Major Overhaul

A 12,000 running hours major overhaul was carried out by INJEGOV on a Pielstick medium-speed diesel engine operating...
Dec 11 2025

Understanding FIVA Valves & Their Impact on ME Engine Performance

FIVA valves play a critical role in fuel injection and exhaust timing on ME engines. This insight explains how they...
Nov 27 2025

Workshop Upgrades with FIVA Test Bench and Specialized Training

INJEGOV has upgraded its workshop with a state-of-the-art test bench for FIVA, ELFI, and ELVA valves, enabling highly...
Nov 27 2025

Four-Stroke Crankshaft Reconditioning with Laser Cladding

This project showcases the complete reconditioning of a four-stroke crankshaft at INJEGOV’s mechanical workshop in...
Nov 17 2025

Woodward UG-10 Governor

A high-output mechanical-hydraulic governor delivering precise, stable speed control for diesel/gas engines and steam...
INJEGOV Renews GALI Authorized Distributor Agreement for 2026
Nov 13 2025

INJEGOV Renews GALI Partnership for 2026

INJEGOV welcomed GALI’s Branch Director, Enrico Borando, to its headquarters in Greece for the official signing of the...